p4(340x370)

Fire Fighting system

  • 1) Preliminary system coverage designs and layouts.
  • 2) Code analysis.
  • 3) Hydraulic calculations.
  • 4) Component specifications (fire pump skids, alarm check valves, valve trims, sensor, aboveground/underground distribution materials, post indicator valves (PIV), sectional control valves (SCV), etc.).
  • 5) Seismic analysis and calculations.
  • 6) Complete FM review packages.